PEAK GOLD MINES • COBAR, NEW SOUTH WALES • 2025 - 2026
Cobar Basin Optimisation Program
Tailings Thickener & Ball Mill
SCOPE
Works completed in a brownfield environment and daily coordination with operational teams to minimise the impact on the operating plant. The Projects were completed with the end result allowing the plant to increase its overall throughput from 800ktpa to 1.2mtpa.
Metric PCM was engaged to provide Project Consultancy Services during the execution phase of a Program of Projects including:
Tailings Thickener and Process Water Upgrades
Ball Mill
Ore Transfer and Materials Handling Upgrades
The Program included the relocation and installation of the following equipment:
1MW Ball Mill (relocated from another mine site)
Cyclone nest (new)
Slurry Pumps (new)
Dewatering Thickener (new)
High Voltage equipment (new)
Switchroom and MCC (relocated from another mine site)
Our Project Services Included:
Our Project Team includes a construction manager, project engineers, construction superintendents , project controls engineer, project administration support and specialist input as needed from contracts, commissioning, engineering, drafting personnel.
Our Project Team