FEDERATION PROJECT
FEDERATION MINE (2023-2025)
Metric PCM was engaged to provide Project Consultancy Services during the execution phase of a Program of Projects including:
~6000m of capital development to first ore (by mining contractor)
Public Roads – 8km access road to mine and associated intersections
Mine Infrastructure Area including: offices, gate security, sewerage, fencing etc.
Site Civil Works including: roads, drainage, infrastructure pads, Run of Mine pads, environmental dams and monitoring bores.
Surface raisebores and shaft lining ~300 total meters
Surface to underground escape ladderway, rising mains and 11kV cable dropper
Magazine compounds including: pads, containerized magazines, fencing and earth protection systems
1MW primary ventilation system
Electrical power supply to mine and services (offgrid) including: 5MW diesel power station, 11kV reticulation, Switchgear, transformers and low voltage MCCs
Water reticulation systems including: tanks, pumps, bores, pipelines etc.
250ML HDPE lined water storage dam
Mobile equipment workshop (dome and container construction)
Hera Resources Nymagee, New South Wales
Our Services:
Our Project Team includes a construction manager, project engineers, construction superintendents , project controls engineer, project administration support and specialist input as needed from contracts, commissioning, engineering, drafting personnel.